Plan a journey
From Versailles Chantiers to Gallieni by subway:
The fastest route in the Paris subway from Versailles Chantiers to Gallieni takes 66 minutes. This route takes lines , and . It includes two connections at Invalides and République. The complete route crosses 27 stations.
Result of the trip Versailles Chantiers Gallieni by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Versailles Chantiers and take subway line t Saint-Martin d'Etampes, Juvisy ou Dourdan ou Massy Palaiseau, Versailles Chantiers ou Pont de Rungis aéroport d'Orly | ||
1 | C | Versailles Chantiers |
2 | C | Viroflay-Rive Gauche |
3 | C | Chaville - Vélizy |
4 | C | Meudon Val Fleury |
5 | C | Issy |
6 | C | Issy - Val-de-Seine |
7 | C | Pont du Garigliano (Hôpital Georges Pompidou) |
8 | C | Javel |
9 | C | Champs de Mars Tour Eiffel |
10 | C | Pont de l'Alma |
11 | C | Invalides |
Correspondance Change at Invalides station and take subway line towards Créteil - Pointe du Lac | ||
12 | 8 | Invalides |
13 | 8 | Concorde |
14 | 8 | Madeleine |
15 | 8 | Opéra |
16 | 8 | Richelieu Drouot |
17 | 8 | Grands Boulevards |
18 | 8 | Bonne Nouvelle |
19 | 8 | Strasbourg Saint-Denis |
20 | 8 | République |
Correspondance Change at République station and take subway line towards Gallieni | ||
21 | 3 | République |
22 | 3 | Parmentier |
23 | 3 | Rue Saint-Maur |
24 | 3 | Père Lachaise |
25 | 3 | Gambetta |
26 | 3 | Porte de Bagnolet |
27 | 3 | Gallieni |
Get off at Gallieni | ||
Position of the exits on the platform of the arrival station Gallieni (the wagons in green are near the exits) |
The departure point, Versailles Chantiers, is located at a distance of 22,024 km from the destination (Gallieni). On foot, he travel time between the departure and the destination is 4 h 54 mn.
All metro or RER routes to Gallieni.
By bike, the trajet Versailles Chantiers Gallieni route takes 1 h 42 mn.
Self-service bicycles closest to Versailles Chantiers
Self-service bicycles closest to Gallieni
The station Gallieni, located at Paris, was inaugurated on 2 avril 1971. It benefits from an annual attendance of 6 075 015 travellers.
Detailed plan of route Versailles Chantiers Gallieni by subway:
Highly requested routes:
Gallieni Gare de Lyon | Gallieni Gare du nord | Gallieni Gare Montparnasse | Gallieni Gare Saint-Lazare
| Gallieni Châtelet-les-Halles
| Gallieni République
| Gallieni Nation