Plan a journey
From Versailles Chantiers to Bérault by subway:
The fastest route in the Paris subway from Versailles Chantiers to Bérault takes 65 minutes. This route takes lines , and . It includes two connections at Gare d'Austerlitz and Bastille. The complete route crosses 24 stations.
Result of the trip Versailles Chantiers Bérault by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Versailles Chantiers and take subway line t Saint-Martin d'Etampes, Juvisy ou Dourdan ou Massy Palaiseau, Versailles Chantiers ou Pont de Rungis aéroport d'Orly | ||
1 | C | Versailles Chantiers |
2 | C | Viroflay-Rive Gauche |
3 | C | Chaville - Vélizy |
4 | C | Meudon Val Fleury |
5 | C | Issy |
6 | C | Issy - Val-de-Seine |
7 | C | Pont du Garigliano (Hôpital Georges Pompidou) |
8 | C | Javel |
9 | C | Champs de Mars Tour Eiffel |
10 | C | Pont de l'Alma |
11 | C | Invalides |
12 | C | Musée d'Orsay |
13 | C | St-Michel Notre-Dame |
14 | C | Gare d'Austerlitz |
Correspondance Change at Gare d'Austerlitz station and take subway line towards Bobigny - Pablo Picasso | ||
15 | 5 | Gare d'Austerlitz |
16 | 5 | Quai de la Rapée |
17 | 5 | Bastille |
Correspondance Change at Bastille station and take subway line towards Château de Vincennes | ||
18 | 1 | Bastille |
19 | 1 | Gare de Lyon |
20 | 1 | Reuilly - Diderot |
21 | 1 | Nation |
22 | 1 | Porte de Vincennes |
23 | 1 | Saint-Mandé |
24 | 1 | Bérault |
Get off at Bérault | ||
Position of the exits on the platform of the arrival station Bérault (the wagons in green are near the exits) |
The departure point, Versailles Chantiers, is located at a distance of 22,237 km from the destination (Bérault). On foot, he travel time between the departure and the destination is 4 h 56 mn.
All metro or RER routes to Bérault.
By bike, the trajet Versailles Chantiers Bérault route takes 1 h 43 mn.
Self-service bicycles closest to Versailles Chantiers
Self-service bicycles closest to Bérault
The station Bérault, located at Saint-Mandé, was inaugurated on 24 mars 1934. It benefits from an annual attendance of 2 965 952 travellers.
Detailed plan of route Versailles Chantiers Bérault by subway:
Highly requested routes:
Bérault Gare de Lyon | Bérault Gare du nord | Bérault Gare Montparnasse | Bérault Gare Saint-Lazare
| Bérault Châtelet-les-Halles
| Bérault République
| Bérault Nation