Plan a journey
From Vaneau to Créteil - L'Echat by subway:
The fastest route in the Paris subway from Vaneau to Créteil - L'Echat takes 50 minutes. This route takes lines , and . It includes two connections at Gare d'Austerlitz and Bastille. The complete route crosses 27 stations.
Result of the trip Vaneau Créteil - L'Echat by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Vaneau and take subway line t Gare d'Austerlitz | ||
1 | 10 | Vaneau |
2 | 10 | Sèvres Babylone |
3 | 10 | Mabillon |
4 | 10 | Odéon |
5 | 10 | Cluny La Sorbonne |
6 | 10 | Maubert - Mutualité |
7 | 10 | Cardinal Lemoine |
8 | 10 | Jussieu |
9 | 10 | Gare d'Austerlitz |
Correspondance Change at Gare d'Austerlitz station and take subway line towards Bobigny - Pablo Picasso | ||
10 | 5 | Gare d'Austerlitz |
11 | 5 | Quai de la Rapée |
12 | 5 | Bastille |
Correspondance Change at Bastille station and take subway line towards Créteil - Pointe du Lac | ||
13 | 8 | Bastille |
14 | 8 | Ledru - Rollin |
15 | 8 | Faidherbe Chaligny |
16 | 8 | Reuilly - Diderot |
17 | 8 | Montgallet |
18 | 8 | Daumesnil |
19 | 8 | Michel Bizot |
20 | 8 | Porte Dorée |
21 | 8 | Porte de Charenton |
22 | 8 | Liberté |
23 | 8 | Charenton - Ecoles |
24 | 8 | Ecole vétérinaire de Maisons-Alfort |
25 | 8 | Maisons-Alfort - Stade |
26 | 8 | Maisons-Alfort Les Juilliottes |
27 | 8 | Créteil - L'Echat |
Get off at Créteil - L'Echat | ||
Position of the exits on the platform of the arrival station Créteil - L'Echat (the wagons in green are near the exits) |
The departure point, Vaneau, is located at a distance of 11,028 km from the destination (Créteil - L'Echat). On foot, he travel time between the departure and the destination is 2 h 27 mn.
All metro or RER routes to Créteil - L'Echat.
By bike, the trajet Vaneau Créteil - L'Echat route takes 51 mn.
Self-service bicycles closest to Vaneau
Self-service bicycles closest to Créteil - L'Echat
The inauguration of the Vaneau subway station took place on 30 décembre 1923.
The annual attendance of this station is 960 528 passengers.
The station Créteil - L'Echat, located at Créteil, was inaugurated on 24 septembre 1973.
It benefits from an annual attendance of 2 334 535 travellers.
Detailed plan of route Vaneau Créteil - L'Echat by subway:
Highly requested routes:
Créteil - L'Echat Gare de Lyon | Créteil - L'Echat Gare du nord | Créteil - L'Echat Gare Montparnasse | Créteil - L'Echat Gare Saint-Lazare
| Créteil - L'Echat Châtelet-les-Halles
| Créteil - L'Echat République
| Créteil - L'Echat Nation
Streets near the departure location Vaneau:
Rue de Sèvres, Rue du Bac, Rue du Cherche-Midi, Rue Jean Ferrandi, Rue Saint-Jean-Baptiste de la Salle, Rue Saint-Romain, Square Saint-Romain, Rue Chomel, Rue de Babylone, Rue de Vaugirard, Rue Mayet