Plan a journey
From Saint-Denis - Université to Saint-Sébastien Froissart by subway:
The fastest route in the Paris subway from Saint-Denis - Université to Saint-Sébastien Froissart takes 38 minutes. This route takes lines , and . It includes two connections at Mairie de Saint-Ouen and Madeleine. The complete route crosses 20 stations.
RATP Métro 14
14
Métro 14 : Travaux - Trafic interrompu
Jusqu'au 29/04, du lundi au jeudi à partir de 22h, le trafic est interrompu sur l'ensemble de la ligne en raison de travaux.
Bus de remplacement.
Result of the trip Saint-Denis - Université Saint-Sébastien Froissart by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Saint-Denis - Université and take subway line t Châtillon - Montrouge | ||
1 | 13 | Saint-Denis - Université |
2 | 13 | Basilique de Saint-Denis |
3 | 13 | Saint-Denis Porte de Paris |
4 | 13 | Carrefour Pleyel |
5 | 13 | Mairie de Saint-Ouen |
Correspondance Change at Mairie de Saint-Ouen station and take subway line towards Olympiades | ||
6 | 14 | Mairie de Saint-Ouen |
7 | 14 | Saint-Ouen |
8 | 14 | Porte de Clichy |
9 | 14 | Pont Cardinet |
10 | 14 | Saint-Lazare |
11 | 14 | Madeleine |
Correspondance Change at Madeleine station and take subway line towards Créteil - Pointe du Lac | ||
12 | 8 | Madeleine |
13 | 8 | Opéra |
14 | 8 | Richelieu Drouot |
15 | 8 | Grands Boulevards |
16 | 8 | Bonne Nouvelle |
17 | 8 | Strasbourg Saint-Denis |
18 | 8 | République |
19 | 8 | Filles du Calvaire |
20 | 8 | Saint-Sébastien Froissart |
Get off at Saint-Sébastien Froissart | ||
Position of the exits on the platform of the arrival station Saint-Sébastien Froissart (the wagons in green are near the exits) |
The departure point, Saint-Denis - Université, is located at a distance of 9,437 km from the destination (Saint-Sébastien Froissart). On foot, he travel time between the departure and the destination is 2 h 06 mn.
All metro or RER routes to Saint-Sébastien Froissart.
By bike, the trajet Saint-Denis - Université Saint-Sébastien Froissart route takes 44 mn.
Self-service bicycles closest to Saint-Denis - Université
Self-service bicycles closest to Saint-Sébastien Froissart
The inauguration of the Saint-Denis - Université subway station took place on 25 mai 1998.
The annual attendance of this station is 4 969 367 passengers.
The station Saint-Sébastien Froissart, located at Paris, was inaugurated on 5 mai 1931.
It benefits from an annual attendance of 1 785 413 travellers.
Detailed plan of route Saint-Denis - Université Saint-Sébastien Froissart by subway:
Highly requested routes:
Saint-Sébastien Froissart Gare de Lyon | Saint-Sébastien Froissart Gare du nord | Saint-Sébastien Froissart Gare Montparnasse | Saint-Sébastien Froissart Gare Saint-Lazare
| Saint-Sébastien Froissart Châtelet-les-Halles
| Saint-Sébastien Froissart République
| Saint-Sébastien Froissart Nation
Streets near the destination Saint-Sébastien Froissart:
Boulevard Beaumarchais, Boulevard des Filles du Calvaire, Rue Amelot, Rue du Pont aux Choux, Rue Froissart, Rue Marcel Gromaire, Rue Saint-Sébastien, Impasse Amelot, Passage Saint-Pierre Amelot, Rue Commines, Rue de Hesse, Rue des Filles du Calvaire, Rue Oberkampf, Rue Pelée