Plan a journey
From Pont de Levallois Bécon to Versailles Chantiers by subway:
The fastest route in the Paris subway from Pont de Levallois Bécon to Versailles Chantiers takes 62 minutes. This route takes lines , and . It includes two connections at Pereire-Levallois and Champs de Mars Tour Eiffel. The complete route crosses 21 stations.
Result of the trip Pont de Levallois Bécon Versailles Chantiers by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Pont de Levallois Bécon and take subway line t Gallieni | ||
1 | 3 | Pont de Levallois Bécon |
2 | 3 | Anatole France |
3 | 3 | Louise Michel |
4 | 3 | Porte de Champerret |
5 | 3 | Pereire |
Correspondance Change at Pereire station and take subway line towards Saint-Martin d'Etampes, Juvisy ou Dourdan ou Massy Palaiseau, Versailles Chantiers ou Pont de Rungis aéroport d'Orly | ||
6 | C | Pereire-Levallois |
7 | C | Neuilly-Porte Maillot |
8 | C | avenue Foch |
9 | C | Avenue Henri Martin |
10 | C | Boulainvilliers |
11 | C | Avenue du Président Kennedy maison de Radio France |
12 | C | Champs de Mars Tour Eiffel |
Correspondance Change at Champs de Mars Tour Eiffel station and take subway line towards Saint-Quentin en Yvelines | ||
13 | C | Champs de Mars Tour Eiffel |
14 | C | Javel |
15 | C | Pont du Garigliano (Hôpital Georges Pompidou) |
16 | C | Issy - Val-de-Seine |
17 | C | Issy |
18 | C | Meudon Val Fleury |
19 | C | Chaville - Vélizy |
20 | C | Viroflay-Rive Gauche |
21 | C | Versailles Chantiers |
Get off at Versailles Chantiers |
The departure point, Pont de Levallois Bécon, is located at a distance of 15,529 km from the destination (Versailles Chantiers). On foot, he travel time between the departure and the destination is 3 h 27 mn.
All metro or RER routes to Versailles Chantiers.
By bike, the trajet Pont de Levallois Bécon Versailles Chantiers route takes 1 h 12 mn.
Self-service bicycles closest to Pont de Levallois Bécon
Self-service bicycles closest to Versailles Chantiers
The inauguration of the Pont de Levallois Bécon subway station took place on 24 septembre 1937.
The annual attendance of this station is 4 969 844 passengers.
Detailed plan of route Pont de Levallois Bécon Versailles Chantiers by subway:
Highly requested routes:
Versailles Chantiers Gare de Lyon | Versailles Chantiers Gare du nord | Versailles Chantiers Gare Montparnasse | Versailles Chantiers Gare Saint-Lazare
| Versailles Chantiers Châtelet-les-Halles
| Versailles Chantiers République
| Versailles Chantiers Nation