Paris subway : from Marcel Sembat to Ledru - Rollin

french version

Plan a journey

Check the metro or RER lines you would like to avoid : - - - - - - - - - - - - - - - - - -

From Marcel Sembat to Ledru - Rollin by subway:

The fastest route in the Paris subway from Marcel Sembat to Ledru - Rollin takes 47 minutes. This route takes lines subway line 9, subway line 1 and subway line 8. It includes two connections at Franklin D. Roosevelt and Bastille. The complete route crosses 25 stations.

Result of the trip Marcel Sembat Ledru - Rollin by subway or RER with two connections:

Détail du trajet Marcel Sembat Ledru - Rollin
Nombre de
stations
Ligne de métro et
Nom des stations
pieton Go to Marcel Sembat and take subway line subway line 9
t Mairie de Montreuil
1 9 Marcel Sembat
2 9 Porte de Saint-Cloud
3 9 Exelmans
4 9 Michel Ange Molitor
5 9 Michel Ange Auteuil
6 9 Jasmin
7 9 Ranelagh
8 9 La Muette
9 9 Rue de la Pompe
10 9 Trocadéro
11 9 Iéna
12 9 Alma Marceau
13 9 Franklin D. Roosevelt
pieton
Correspondance
Change at Franklin D. Roosevelt station and take subway line subway line 1
towards Château de Vincennes
14 1 Franklin D. Roosevelt
15 1 Champs Elysées Clémenceau
16 1 Concorde
17 1 Tuileries
18 1 Palais Royal Musée du Louvre
19 1 Louvre Rivoli
20 1 Châtelet
21 1 Hôtel de Ville
22 1 Saint-Paul
23 1 Bastille
pieton
Correspondance
Change at Bastille station and take subway line subway line 8
towards Créteil - Pointe du Lac
24 8 Bastille
25 8 Ledru - Rollin
pieton Get off at Ledru - Rollin
Position of the exits on the platform of the arrival station Ledru - Rollin
(the wagons in green are near the exits)
position des sorties

The departure point, Marcel Sembat, is located at a distance of 9,899 km from the destination (Ledru - Rollin). On foot, he travel time between the departure and the destination is 2 h 12 mn.

All metro or RER routes to Ledru - Rollin.

By bike, the trajet Marcel Sembat Ledru - Rollin route takes 46 mn.

Self-service bicycles closest to Marcel Sembat

Self-service bicycles closest to Ledru - Rollin

The inauguration of the Marcel Sembat subway station took place on 3 février 1934. The annual attendance of this station is 5 783 355 passengers.
The station Ledru - Rollin, located at Paris, was inaugurated on 5 mai 1931. It benefits from an annual attendance of 3 820 123 travellers.

Detailed plan of route Marcel Sembat Ledru - Rollin by subway:

 

Highly requested routes:

Ledru - Rollin Gare de Lyon | Ledru - Rollin Gare du nord | Ledru - Rollin Gare Montparnasse | Ledru - Rollin Gare Saint-Lazare | Ledru - Rollin Châtelet-les-Halles | Ledru - Rollin République | Ledru - Rollin Nation

Streets near the destination Ledru - Rollin:

Avenue Ledru-Rollin, Cour de l’Ours, Passage de la Bonne Graine, Rue Antoine Vollon, Rue de Prague, Rue du Faubourg Saint-Antoine, Rue Théophile Roussel, Rue Traversière, Cour de l’Etoile d’Or, Place d’Aligre, Rue Charles Baudelaire, Rue de Charenton, Rue de Charonne

How to get there by subway ?

Monuments of Paris | Museums of Paris | Performance halls | go to Disneyland Park | go to the Palace of Versailles | Department stores | Grandes écoles de Paris | Research laboratories | Hospitals in Paris and the Paris region | How to take the subway in Paris



      © 2024   www.itineraire-metro.fr   Legal information