Plan a journey
From Malakoff Rue Etienne Dolet to Ledru - Rollin by subway:
The fastest route in the Paris subway from Malakoff Rue Etienne Dolet to Ledru - Rollin takes 43 minutes. This route takes lines and . It has only one change at Invalides station . The complete route crosses 25 stations.
RATP Métro 13
13
Métro 13 : Difficultés d'exploitation - Trafic perturbé
Le trafic est perturbé entre La Fourche et Saint-Denis – Université en direction de Saint-Denis – Université en raison de difficultés d'exploitation.
Result of the trip Malakoff Rue Etienne Dolet Ledru - Rollin by subway or RER with a connection:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Malakoff Rue Etienne Dolet and take subway line towards Saint-Denis Université Asnières-Gennevilliers - Les Courtilles | ||
1 | 13 | Malakoff Rue Etienne Dolet |
2 | 13 | Malakoff Plateau de Vanves |
3 | 13 | Porte de Vanves |
4 | 13 | Plaisance |
5 | 13 | Pernety |
6 | 13 | Gaîté |
7 | 13 | Montparnasse-Bienvenüe |
8 | 13 | Duroc |
9 | 13 | Saint françois Xavier |
10 | 13 | Varenne |
11 | 13 | Invalides |
Correspondance Change at Invalides station and take subway line towards Créteil - Pointe du Lac | ||
12 | 8 | Invalides |
13 | 8 | Concorde |
14 | 8 | Madeleine |
15 | 8 | Opéra |
16 | 8 | Richelieu Drouot |
17 | 8 | Grands Boulevards |
18 | 8 | Bonne Nouvelle |
19 | 8 | Strasbourg Saint-Denis |
20 | 8 | République |
21 | 8 | Filles du Calvaire |
22 | 8 | Saint-Sébastien Froissart |
23 | 8 | Chemin Vert |
24 | 8 | Bastille |
25 | 8 | Ledru - Rollin |
Get off at Ledru - Rollin | ||
Position of the exits on the platform of the arrival station Ledru - Rollin (the wagons in green are near the exits) |
The departure point, Malakoff Rue Etienne Dolet, is located at a distance of 7,038 km from the destination (Ledru - Rollin). On foot, he travel time between the departure and the destination is 1 h 34 mn.
All metro or RER routes to Ledru - Rollin.
By bike, the trajet Malakoff Rue Etienne Dolet Ledru - Rollin route takes 32 mn.
Self-service bicycles closest to Malakoff Rue Etienne Dolet
Self-service bicycles closest to Ledru - Rollin
The inauguration of the Malakoff Rue Etienne Dolet subway station took place on 9 novembre 1976.
The annual attendance of this station is 1 832 499 passengers.
The station Ledru - Rollin, located at Paris, was inaugurated on 5 mai 1931.
It benefits from an annual attendance of 3 820 123 travellers.
Detailed plan of route Malakoff Rue Etienne Dolet Ledru - Rollin by subway:
Highly requested routes:
Ledru - Rollin Gare de Lyon | Ledru - Rollin Gare du nord | Ledru - Rollin Gare Montparnasse | Ledru - Rollin Gare Saint-Lazare
| Ledru - Rollin Châtelet-les-Halles
| Ledru - Rollin République
| Ledru - Rollin Nation
Streets near the destination Ledru - Rollin:
Avenue Ledru-Rollin, Cour de l’Ours, Passage de la Bonne Graine, Rue Antoine Vollon, Rue de Prague, Rue du Faubourg Saint-Antoine, Rue Théophile Roussel, Rue Traversière, Cour de l’Etoile d’Or, Place d’Aligre, Rue Charles Baudelaire, Rue de Charenton, Rue de Charonne