Plan a journey
From Mairie de Montrouge to Pont de Neuilly by subway:
The fastest route in the Paris subway from Mairie de Montrouge to Pont de Neuilly takes 42 minutes. This route takes lines , and . It includes two connections at Montparnasse-Bienvenüe and Champs Elysées Clémenceau. The complete route crosses 22 stations.
Result of the trip Mairie de Montrouge Pont de Neuilly by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Mairie de Montrouge and take subway line t Porte de Clignancourt | ||
1 | 4 | Mairie de Montrouge |
2 | 4 | Porte d'Orléans |
3 | 4 | Alésia |
4 | 4 | Mouton Duvernet |
5 | 4 | Denfert-Rochereau |
6 | 4 | Raspail |
7 | 4 | Vavin |
8 | 4 | Montparnasse-Bienvenüe |
Correspondance Change at Montparnasse-Bienvenüe station and take subway line towards Saint-Denis Université Asnières-Gennevilliers - Les Courtilles | ||
9 | 13 | Montparnasse-Bienvenüe |
10 | 13 | Duroc |
11 | 13 | Saint françois Xavier |
12 | 13 | Varenne |
13 | 13 | Invalides |
14 | 13 | Champs Elysées Clémenceau |
Correspondance Change at Champs Elysées Clémenceau station and take subway line towards La Défense (Grande Arche) | ||
15 | 1 | Champs Elysées Clémenceau |
16 | 1 | Franklin D. Roosevelt |
17 | 1 | Georges V |
18 | 1 | Charles de Gaulle Etoile |
19 | 1 | Argentine |
20 | 1 | Porte Maillot |
21 | 1 | Les Sablons |
22 | 1 | Pont de Neuilly |
Get off at Pont de Neuilly | ||
Position of the exits on the platform of the arrival station Pont de Neuilly (the wagons in green are near the exits) |
The departure point, Mairie de Montrouge, is located at a distance of 8,628 km from the destination (Pont de Neuilly). On foot, he travel time between the departure and the destination is 1 h 55 mn.
All metro or RER routes to Pont de Neuilly.
By bike, the trajet Mairie de Montrouge Pont de Neuilly route takes 40 mn.
Self-service bicycles closest to Mairie de Montrouge
Self-service bicycles closest to Pont de Neuilly
The inauguration of the Mairie de Montrouge subway station took place on 23 mars 2013.
The annual attendance of this station is 5 757 464 passengers.
The station Pont de Neuilly, located at La Défense, was inaugurated on 29 avril 1937.
It benefits from an annual attendance of 6 786 803 travellers.
Detailed plan of route Mairie de Montrouge Pont de Neuilly by subway:
Highly requested routes:
Pont de Neuilly Gare de Lyon | Pont de Neuilly Gare du nord | Pont de Neuilly Gare Montparnasse | Pont de Neuilly Gare Saint-Lazare
| Pont de Neuilly Châtelet-les-Halles
| Pont de Neuilly République
| Pont de Neuilly Nation