Plan a journey
From Mairie de Montrouge to Créteil Pointe du Lac by subway:
The fastest route in the Paris subway from Mairie de Montrouge to Créteil Pointe du Lac takes 53 minutes. This route takes lines , and . It includes two connections at Denfert-Rochereau and Daumesnil. The complete route crosses 29 stations.
Result of the trip Mairie de Montrouge Créteil Pointe du Lac by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Mairie de Montrouge and take subway line t Porte de Clignancourt | ||
1 | 4 | Mairie de Montrouge |
2 | 4 | Porte d'Orléans |
3 | 4 | Alésia |
4 | 4 | Mouton Duvernet |
5 | 4 | Denfert-Rochereau |
Correspondance Change at Denfert-Rochereau station and take subway line towards Nation | ||
6 | 6 | Denfert-Rochereau |
7 | 6 | Saint-Jacques |
8 | 6 | Glacière |
9 | 6 | Corvisart |
10 | 6 | Place d'Italie |
11 | 6 | Nationale |
12 | 6 | Chevaleret |
13 | 6 | Quai de la Gare |
14 | 6 | Bercy |
15 | 6 | Dugommier |
16 | 6 | Daumesnil |
Correspondance Change at Daumesnil station and take subway line towards Créteil - Pointe du Lac | ||
17 | 8 | Daumesnil |
18 | 8 | Michel Bizot |
19 | 8 | Porte Dorée |
20 | 8 | Porte de Charenton |
21 | 8 | Liberté |
22 | 8 | Charenton - Ecoles |
23 | 8 | Ecole vétérinaire de Maisons-Alfort |
24 | 8 | Maisons-Alfort - Stade |
25 | 8 | Maisons-Alfort Les Juilliottes |
26 | 8 | Créteil - L'Echat |
27 | 8 | Créteil - Université |
28 | 8 | Créteil Préfecture |
29 | 8 | Créteil Pointe du Lac |
Get off at Créteil Pointe du Lac |
The departure point, Mairie de Montrouge, is located at a distance of 11,969 km from the destination (Créteil Pointe du Lac). On foot, he travel time between the departure and the destination is 2 h 40 mn.
All metro or RER routes to Créteil Pointe du Lac.
By bike, the trajet Mairie de Montrouge Créteil Pointe du Lac route takes 55 mn.
Self-service bicycles closest to Mairie de Montrouge
Self-service bicycles closest to Créteil Pointe du Lac
The inauguration of the Mairie de Montrouge subway station took place on 23 mars 2013.
The annual attendance of this station is 5 757 464 passengers.
Detailed plan of route Mairie de Montrouge Créteil Pointe du Lac by subway:
Highly requested routes:
Créteil Pointe du Lac Gare de Lyon | Créteil Pointe du Lac Gare du nord | Créteil Pointe du Lac Gare Montparnasse | Créteil Pointe du Lac Gare Saint-Lazare
| Créteil Pointe du Lac Châtelet-les-Halles
| Créteil Pointe du Lac République
| Créteil Pointe du Lac Nation