Plan a journey
From Mairie de Montreuil to Versailles Chantiers by subway:
The fastest route in the Paris subway from Mairie de Montreuil to Versailles Chantiers takes 76 minutes. This route takes lines , and . It includes two connections at Bonne Nouvelle and Invalides. The complete route crosses 33 stations.
Result of the trip Mairie de Montreuil Versailles Chantiers by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Mairie de Montreuil and take subway line t Pont de Sèvres | ||
1 | 9 | Mairie de Montreuil |
2 | 9 | Croix de Chavaux |
3 | 9 | Robespierre |
4 | 9 | Porte de Montreuil |
5 | 9 | Maraîchers |
6 | 9 | Buzenval |
7 | 9 | Nation |
8 | 9 | Rue des Boulets |
9 | 9 | Charonne |
10 | 9 | Voltaire |
11 | 9 | Saint-Ambroise |
12 | 9 | Oberkampf |
13 | 9 | République |
14 | 9 | Strasbourg Saint-Denis |
15 | 9 | Bonne Nouvelle |
Correspondance Change at Bonne Nouvelle station and take subway line towards Balard | ||
16 | 8 | Bonne Nouvelle |
17 | 8 | Grands Boulevards |
18 | 8 | Richelieu Drouot |
19 | 8 | Opéra |
20 | 8 | Madeleine |
21 | 8 | Concorde |
22 | 8 | Invalides |
Correspondance Change at Invalides station and take subway line towards Saint-Quentin en Yvelines | ||
23 | C | Invalides |
24 | C | Pont de l'Alma |
25 | C | Champs de Mars Tour Eiffel |
26 | C | Javel |
27 | C | Pont du Garigliano (Hôpital Georges Pompidou) |
28 | C | Issy - Val-de-Seine |
29 | C | Issy |
30 | C | Meudon Val Fleury |
31 | C | Chaville - Vélizy |
32 | C | Viroflay-Rive Gauche |
33 | C | Versailles Chantiers |
Get off at Versailles Chantiers |
The departure point, Mairie de Montreuil, is located at a distance of 23,641 km from the destination (Versailles Chantiers). On foot, he travel time between the departure and the destination is 5 h 15 mn.
All metro or RER routes to Versailles Chantiers.
By bike, the trajet Mairie de Montreuil Versailles Chantiers route takes 1 h 49 mn.
Self-service bicycles closest to Mairie de Montreuil
Self-service bicycles closest to Versailles Chantiers
The inauguration of the Mairie de Montreuil subway station took place on 14 octobre 1937.
The annual attendance of this station is 6 642 631 passengers.
Detailed plan of route Mairie de Montreuil Versailles Chantiers by subway:
Highly requested routes:
Versailles Chantiers Gare de Lyon | Versailles Chantiers Gare du nord | Versailles Chantiers Gare Montparnasse | Versailles Chantiers Gare Saint-Lazare
| Versailles Chantiers Châtelet-les-Halles
| Versailles Chantiers République
| Versailles Chantiers Nation