Plan a journey
From Gabriel Péri to Bobigny-Pantin Raymond Queneau by subway:
The fastest route in the Paris subway from Gabriel Péri to Bobigny-Pantin Raymond Queneau takes 40 minutes. This route takes lines , and . It includes two connections at Place de Clichy and Gare du Nord. The complete route crosses 21 stations.
Result of the trip Gabriel Péri Bobigny-Pantin Raymond Queneau by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Gabriel Péri and take subway line t Châtillon - Montrouge | ||
1 | 13 | Gabriel Péri |
2 | 13 | Mairie de Clichy |
3 | 13 | Porte de Clichy |
4 | 13 | Brochant |
5 | 13 | La Fourche |
6 | 13 | Place de Clichy |
Correspondance Change at Place de Clichy station and take subway line towards Nation | ||
7 | 2 | Place de Clichy |
8 | 2 | Blanche |
9 | 2 | Pigalle |
10 | 2 | Anvers |
11 | 2 | Barbès Rochechouart |
12 | 2 | La Chapelle |
Correspondance Change at La Chapelle station and take subway line towards Bobigny - Pablo Picasso | ||
13 | 5 | Gare du Nord |
14 | 5 | Stalingrad |
15 | 5 | Jaurès |
16 | 5 | Laumière |
17 | 5 | Ourcq |
18 | 5 | Porte de Pantin |
19 | 5 | Hoche |
20 | 5 | Eglise de Pantin |
21 | 5 | Bobigny-Pantin Raymond Queneau |
Get off at Bobigny-Pantin Raymond Queneau | ||
Position of the exits on the platform of the arrival station Bobigny-Pantin Raymond Queneau (the wagons in green are near the exits) |
The departure point, Gabriel Péri, is located at a distance of 9,832 km from the destination (Bobigny-Pantin Raymond Queneau). On foot, he travel time between the departure and the destination is 2 h 11 mn.
All metro or RER routes to Bobigny-Pantin Raymond Queneau.
By bike, the trajet Gabriel Péri Bobigny-Pantin Raymond Queneau route takes 45 mn.
Self-service bicycles closest to Gabriel Péri
Self-service bicycles closest to Bobigny-Pantin Raymond Queneau
The inauguration of the Gabriel Péri subway station took place on 3 mai 1980.
The annual attendance of this station is 5 235 722 passengers.
The station Bobigny-Pantin Raymond Queneau, located at Pantin, was inaugurated on 25 avril 1985.
It benefits from an annual attendance of 2 412 852 travellers.
Detailed plan of route Gabriel Péri Bobigny-Pantin Raymond Queneau by subway:
Highly requested routes:
Bobigny-Pantin Raymond Queneau Gare de Lyon | Bobigny-Pantin Raymond Queneau Gare du nord | Bobigny-Pantin Raymond Queneau Gare Montparnasse | Bobigny-Pantin Raymond Queneau Gare Saint-Lazare
| Bobigny-Pantin Raymond Queneau Châtelet-les-Halles
| Bobigny-Pantin Raymond Queneau République
| Bobigny-Pantin Raymond Queneau Nation