Paris subway : from Boulogne Pont de Saint-Cloud to Arts et Métiers

french version

Plan a journey

Check the metro or RER lines you would like to avoid : - - - - - - - - - - - - - - - - - -

From Boulogne Pont de Saint-Cloud to Arts et Métiers by subway:

The fastest route in the Paris subway from Boulogne Pont de Saint-Cloud to Arts et Métiers takes 45 minutes. This route takes lines subway line 10, subway line 9 and subway line 3. It includes two connections at Michel Ange Molitor and Havre Caumartin. The complete route crosses 24 stations.

Result of the trip Boulogne Pont de Saint-Cloud Arts et Métiers by subway or RER with two connections:

Détail du trajet Boulogne Pont de Saint-Cloud Arts et Métiers
Nombre de
stations
Ligne de métro et
Nom des stations
pieton Go to Boulogne Pont de Saint-Cloud and take subway line subway line 10
t Gare d'Austerlitz
1 10 Boulogne Pont de Saint-Cloud
2 10 Boulogne Jean Jaurès
3 10 Michel Ange Molitor
pieton
Correspondance
Change at Michel Ange Molitor station and take subway line subway line 9
towards Mairie de Montreuil
4 9 Michel Ange Molitor
5 9 Michel Ange Auteuil
6 9 Jasmin
7 9 Ranelagh
8 9 La Muette
9 9 Rue de la Pompe
10 9 Trocadéro
11 9 Iéna
12 9 Alma Marceau
13 9 Franklin D. Roosevelt
14 9 Saint-Philippe du Roule
15 9 Miromesnil
16 9 Saint-Augustin
17 9 Havre Caumartin
pieton
Correspondance
Change at Havre Caumartin station and take subway line subway line 3
towards Gallieni
18 3 Havre Caumartin
19 3 Opéra
20 3 Quatre Septembre
21 3 Bourse
22 3 Sentier
23 3 Réaumur Sébastopol
24 3 Arts et Métiers
pieton Get off at Arts et Métiers
Position of the exits on the platform of the arrival station Arts et Métiers
(the wagons in green are near the exits)
position des sorties

The departure point, Boulogne Pont de Saint-Cloud, is located at a distance of 9,742 km from the destination (Arts et Métiers). On foot, he travel time between the departure and the destination is 2 h 010 mn.

All metro or RER routes to Arts et Métiers.

By bike, the trajet Boulogne Pont de Saint-Cloud Arts et Métiers route takes 45 mn.

Self-service bicycles closest to Boulogne Pont de Saint-Cloud

Self-service bicycles closest to Arts et Métiers

The inauguration of the Boulogne Pont de Saint-Cloud subway station took place on 2 octobre 1981. The annual attendance of this station is 3 081 186 passengers.
The station Arts et Métiers, located at Paris, was inaugurated on   19 octobre 1904. It benefits from an annual attendance of 3 908 721 travellers.

Detailed plan of route Boulogne Pont de Saint-Cloud Arts et Métiers by subway:

 

Highly requested routes:

Arts et Métiers Gare de Lyon | Arts et Métiers Gare du nord | Arts et Métiers Gare Montparnasse | Arts et Métiers Gare Saint-Lazare | Arts et Métiers Châtelet-les-Halles | Arts et Métiers République | Arts et Métiers Nation

Streets near the destination Arts et Métiers:

Place Theodor Herzl, Rue au Maire, Rue Bailly, Rue Beaubourg, Rue Conté, Rue de Turbigo, Rue Montgolfier, Rue Réaumur, Rue Vaucanson, Rue Volta, Cour de Rome, Rue Chapon, Rue des Gravilliers

How to get there by subway ?

Monuments of Paris | Museums of Paris | Performance halls | go to Disneyland Park | go to the Palace of Versailles | Department stores | Grandes écoles de Paris | Research laboratories | Hospitals in Paris and the Paris region | How to take the subway in Paris



      © 2024   www.itineraire-metro.fr   Legal information