Plan a journey
From Bobigny-Pantin Raymond Queneau to Parc Disneyland (Eurodisney) by subway:
The fastest route in the Paris subway from Bobigny-Pantin Raymond Queneau to Parc Disneyland (Eurodisney) takes 76 minutes. This route takes lines , and . It includes two connections at Gare du Nord and Châtelet - Les Halles. The complete route crosses 26 stations.
Result of the trip Bobigny-Pantin Raymond Queneau Parc Disneyland (Eurodisney) by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Bobigny-Pantin Raymond Queneau and take subway line t Place d'Italie | ||
1 | 5 | Bobigny-Pantin Raymond Queneau |
2 | 5 | Eglise de Pantin |
3 | 5 | Hoche |
4 | 5 | Porte de Pantin |
5 | 5 | Ourcq |
6 | 5 | Laumière |
7 | 5 | Jaurès |
8 | 5 | Stalingrad |
9 | 5 | Gare du Nord |
Correspondance Change at Gare du Nord station and take subway line towards Melun | ||
10 | D | Gare du Nord |
11 | D | Châtelet - Les Halles |
Correspondance Change at Châtelet - Les Halles station and take subway line towards Marne-la-Vallée Chessy | ||
12 | A | Châtelet - Les Halles |
13 | A | Gare de Lyon |
14 | A | Nation |
15 | A | Vincennes |
16 | A | Val de Fontenay |
17 | A | Neuilly-Plaisance |
18 | A | Bry-sur-Marne |
19 | A | Noisy-le-Grand Mont d'Est |
20 | A | Noisy-Champs |
21 | A | Noisiel |
22 | A | Lognes |
23 | A | Torcy |
24 | A | Bussy-Saint-Georges |
25 | A | Val d'Europe |
26 | A | Marne-La-Vallée Chessy (Parc Disneyland) |
Get off at Marne-La-Vallée Chessy (Parc Disneyland) (located 315 m from Parc Disneyland (Eurodisney)) |
The departure point, Bobigny-Pantin Raymond Queneau, is located at a distance of 26,441 km from the destination (Parc Disneyland (Eurodisney)). On foot, he travel time between the departure and the destination is 5 h 53 mn.
By bike, the trajet Bobigny-Pantin Raymond Queneau Parc Disneyland (Eurodisney) route takes 2 h 02 mn.
Self-service bicycles closest to Bobigny-Pantin Raymond Queneau
Self-service bicycles closest to Parc Disneyland (Eurodisney)
The inauguration of the Bobigny-Pantin Raymond Queneau subway station took place on 25 avril 1985.
The annual attendance of this station is 2 412 852 passengers.
Detailed plan of route Bobigny-Pantin Raymond Queneau Parc Disneyland (Eurodisney) by subway:
Highly requested routes:
Parc Disneyland (Eurodisney) Gare de Lyon | Parc Disneyland (Eurodisney) Gare du nord | Parc Disneyland (Eurodisney) Gare Montparnasse | Parc Disneyland (Eurodisney) Gare Saint-Lazare
| Parc Disneyland (Eurodisney) Châtelet-les-Halles
| Parc Disneyland (Eurodisney) République
| Parc Disneyland (Eurodisney) Nation