Plan a journey
From Barbès Rochechouart to Dupleix by subway:
The fastest route in the Paris subway from Barbès Rochechouart to Dupleix takes 32 minutes. This route takes lines and . It has only one change at Charles de Gaulle Etoile station . The complete route crosses 18 stations.
RATP Métro 6
6
Métro 6 : Travaux - Trafic interrompu
Jusqu'au 01/05, du lundi au mercredi à partir de 22h (derniers départs de CDG Étoile et Nation vers 21h40) , trafic interrompu sur l'ensemble de la ligne en raison de travaux.
Bus de remplacement mis en place. Plus d'informations sur le page dédiée.
RATP Métro 6
6
Métro 6 : Bagage oublié - Trafic perturbé
Le trafic est perturbé sur l'ensemble de la ligne en raison d'un bagage oublié à Passy.
Result of the trip Barbès Rochechouart Dupleix by subway or RER with a connection:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Barbès Rochechouart and take subway line towards Porte Dauphine | ||
1 | 2 | Barbès Rochechouart |
2 | 2 | Anvers |
3 | 2 | Pigalle |
4 | 2 | Blanche |
5 | 2 | Place de Clichy |
6 | 2 | Rome |
7 | 2 | Villiers |
8 | 2 | Monceau |
9 | 2 | Courcelles |
10 | 2 | Ternes |
11 | 2 | Charles de Gaulle Etoile |
Correspondance Change at Charles de Gaulle Etoile station and take subway line towards Nation | ||
12 | 6 | Charles de Gaulle Etoile |
13 | 6 | Kléber |
14 | 6 | Boissière |
15 | 6 | Trocadéro |
16 | 6 | Passy |
17 | 6 | Bir-Hakeim |
18 | 6 | Dupleix |
Get off at Dupleix | ||
Position of the exits on the platform of the arrival station Dupleix (the wagons in green are near the exits) |
The departure point, Barbès Rochechouart, is located at a distance of 5,529 km from the destination (Dupleix). On foot, he travel time between the departure and the destination is 1 h 14 mn.
All metro or RER routes to Dupleix.
By bike, the trajet Barbès Rochechouart Dupleix route takes 26 mn.
Self-service bicycles closest to Barbès Rochechouart
Self-service bicycles closest to Dupleix
The inauguration of the Barbès Rochechouart subway station took place on 26 mars 1903.
The annual attendance of this station is 9 174 366 passengers.
The station Dupleix, located at Paris, was inaugurated on 24 avril 1906.
It benefits from an annual attendance of 3 852 225 travellers.
Detailed plan of route Barbès Rochechouart Dupleix by subway:
Highly requested routes:
Dupleix Gare de Lyon | Dupleix Gare du nord | Dupleix Gare Montparnasse | Dupleix Gare Saint-Lazare
| Dupleix Châtelet-les-Halles
| Dupleix République
| Dupleix Nation
Streets near the destination Dupleix:
Boulevard de Grenelle, Rue Auguste Bartholdi, Rue Daniel Stern, Rue Humblot, Rue Juge, Villa Juge, Allée du Général Denain, Allée Marguerite Yourcenar, Place Dupleix, Place Marie Madeleine Fourcade, Rue Clodion, Rue Desaix, Rue Edgar Faure, Rue Fallempin
Streets near the departure location Barbès Rochechouart:
Boulevard Barbès, Boulevard de la Chapelle, Boulevard de Magenta, Boulevard Marguerite de Rochechouart, Place de l’Assommoir, Rue Belhomme, Rue Bervic, Rue Boissieu, Rue de Sofia, Rue du Faubourg Poissonnière, Rue Ambroise Paré, Rue de la Goutte d’Or