Plan a journey
From Vavin to Billancourt by subway:
The fastest route in the Paris subway from Vavin to Billancourt takes 42 minutes. This route takes lines , and . It includes two connections at Montparnasse-Bienvenüe and Trocadéro. The complete route crosses 22 stations.
RATP Métro 6
6
Métro 6 : Travaux - Trafic interrompu
Jusqu'au 01/05, du lundi au mercredi à partir de 22h (derniers départs de CDG Étoile et Nation vers 21h40) , trafic interrompu sur l'ensemble de la ligne en raison de travaux.
Bus de remplacement mis en place. Plus d'informations sur le page dédiée.
Result of the trip Vavin Billancourt by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Vavin and take subway line t Porte de Clignancourt | ||
1 | 4 | Vavin |
2 | 4 | Montparnasse-Bienvenüe |
Correspondance Change at Montparnasse-Bienvenüe station and take subway line towards Charles de Gaulle - Etoile | ||
3 | 6 | Montparnasse-Bienvenüe |
4 | 6 | Pasteur |
5 | 6 | Sèvres Lecourbe |
6 | 6 | Cambronne |
7 | 6 | La Motte Picquet Grenelle |
8 | 6 | Dupleix |
9 | 6 | Bir-Hakeim |
10 | 6 | Passy |
11 | 6 | Trocadéro |
Correspondance Change at Trocadéro station and take subway line towards Pont de Sèvres | ||
12 | 9 | Trocadéro |
13 | 9 | Rue de la Pompe |
14 | 9 | La Muette |
15 | 9 | Ranelagh |
16 | 9 | Jasmin |
17 | 9 | Michel Ange Auteuil |
18 | 9 | Michel Ange Molitor |
19 | 9 | Exelmans |
20 | 9 | Porte de Saint-Cloud |
21 | 9 | Marcel Sembat |
22 | 9 | Billancourt |
Get off at Billancourt | ||
Position of the exits on the platform of the arrival station Billancourt (the wagons in green are near the exits) |
The departure point, Vavin, is located at a distance of 6,815 km from the destination (Billancourt). On foot, he travel time between the departure and the destination is 1 h 31 mn.
All metro or RER routes to Billancourt.
By bike, the trajet Vavin Billancourt route takes 31 mn.
Self-service bicycles closest to Vavin
Self-service bicycles closest to Billancourt
The inauguration of the Vavin subway station took place on 9 janvier 1910.
The annual attendance of this station is 2 275 955 passengers.
The station Billancourt, located at Boulogne-Billancourt, was inaugurated on 3 février 1934.
It benefits from an annual attendance of 2 992 265 travellers.
Detailed plan of route Vavin Billancourt by subway:
Highly requested routes:
Billancourt Gare de Lyon | Billancourt Gare du nord | Billancourt Gare Montparnasse | Billancourt Gare Saint-Lazare
| Billancourt Châtelet-les-Halles
| Billancourt République
| Billancourt Nation
Streets near the departure location Vavin:
Boulevard du Montparnasse, Boulevard Raspail, Place Pablo Picasso, Rue Bréa, Rue Delambre, Rue Huyghens, Rue Péguy, Rue Vavin, Boulevard Edgar Quinet, Place Laurent Terzieff et Pascale de Boysson, Rue de Cicé, Rue du Montparnasse