Plan a journey
From Saint-Jacques to Mabillon by subway:
The fastest route in the Paris subway from Saint-Jacques to Mabillon takes 23 minutes. This route takes lines , and . It includes two connections at Montparnasse-Bienvenüe and Sèvres Babylone. The complete route crosses 11 stations.
RATP Métro 6
6
Métro 6 : Travaux - Trafic interrompu
Jusqu'au 01/05, du lundi au mercredi à partir de 22h (derniers départs de CDG Étoile et Nation vers 21h40) , trafic interrompu sur l'ensemble de la ligne en raison de travaux.
Bus de remplacement mis en place. Plus d'informations sur le page dédiée.
RATP Métro 6
6
Métro 6 : Bagage oublié - Trafic perturbé
Le trafic est perturbé sur l'ensemble de la ligne en raison d'un bagage oublié à Passy.
Result of the trip Saint-Jacques Mabillon by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Saint-Jacques and take subway line t Charles de Gaulle - Etoile | ||
1 | 6 | Saint-Jacques |
2 | 6 | Denfert-Rochereau |
3 | 6 | Raspail |
4 | 6 | Edgar Quinet |
5 | 6 | Montparnasse-Bienvenüe |
Correspondance Change at Montparnasse-Bienvenüe station and take subway line towards Mairie d'Aubervilliers | ||
6 | 12 | Montparnasse-Bienvenüe |
7 | 12 | Notre-Dame des-Champs |
8 | 12 | Rennes |
9 | 12 | Sèvres Babylone |
Correspondance Change at Sèvres Babylone station and take subway line towards Gare d'Austerlitz | ||
10 | 10 | Sèvres Babylone |
11 | 10 | Mabillon |
Get off at Mabillon | ||
Position of the exits on the platform of the arrival station Mabillon (the wagons in green are near the exits) |
The departure point, Saint-Jacques, is located at a distance of 2,216 km from the destination (Mabillon). On foot, he travel time between the departure and the destination is 30 mn.
All metro or RER routes to Mabillon.
By bike, the trajet Saint-Jacques Mabillon route takes 10 mn.
Self-service bicycles closest to Saint-Jacques
Self-service bicycles closest to Mabillon
The inauguration of the Saint-Jacques subway station took place on 24 avril 1906.
The annual attendance of this station is 2 112 450 passengers.
The station Mabillon, located at Paris, was inaugurated on 10 mars 1925.
It benefits from an annual attendance of 1 794 086 travellers.
Detailed plan of route Saint-Jacques Mabillon by subway:
Highly requested routes:
Mabillon Gare de Lyon | Mabillon Gare du nord | Mabillon Gare Montparnasse | Mabillon Gare Saint-Lazare
| Mabillon Châtelet-les-Halles
| Mabillon République
| Mabillon Nation
Streets near the destination Mabillon:
Boulevard Saint-Germain, Passage de la Petite Boucherie, Rue Clément, Rue de l’Echaudé, Rue de Montfaucon, Rue des Ciseaux, Rue du Four, Rue Mabillon, Rue Princesse, Place Jean-Paul Sartre-Simone de Beauvoir, Place Juliette Gréco, Place Saint-Germain des Prés, Place Saint-Sulpice, Rue Bonaparte
Streets near the departure location Saint-Jacques:
Allée Verhaeren, Boulevard Saint-Jacques, Place Saint-Jacques, Rue de la Tombe Issoire, Rue du Faubourg Saint-Jacques, Rue Jean Dolent, Rue Leclerc, Boulevard Arago, Rue Dareau, Rue Emile Dubois, Rue Messier, Villa Saint-Jacques, Avenue Denfert-Rochereau