Plan a journey
From Porte de la Chapelle to Montigny Beauchamp by subway:
The fastest route in the Paris subway from Porte de la Chapelle to Montigny Beauchamp takes 57 minutes. This route takes lines , and . It includes two connections at Saint-Lazare and Saint-Ouen. The complete route crosses 24 stations.
RATP Métro 14
14
Métro 14 : Travaux - Trafic interrompu
Jusqu'au 28/04, le trafic est interrompu sur l'ensemble de la ligne en raison de travaux.
Bus de remplacement.
Result of the trip Porte de la Chapelle Montigny Beauchamp by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Porte de la Chapelle and take subway line t Mairie d'Issy | ||
1 | 12 | Porte de la Chapelle |
2 | 12 | Marx Dormoy |
3 | 12 | Marcadet Poissonniers |
4 | 12 | Jules Joffrin |
5 | 12 | Lamarck Caulaincourt |
6 | 12 | Abbesses |
7 | 12 | Pigalle |
8 | 12 | Saint-Georges |
9 | 12 | Notre-Dame de-Lorette |
10 | 12 | Trinité d'Estienne d'Orves |
11 | 12 | Saint-Lazare |
Correspondance Change at Saint-Lazare station and take subway line towards Mairie de Saint-Ouen | ||
12 | 14 | Saint-Lazare |
13 | 14 | Pont Cardinet |
14 | 14 | Porte de Clichy |
15 | 14 | Saint-Ouen |
Correspondance Change at Saint-Ouen station and take subway line towards Pontoise | ||
16 | C | Saint-Ouen |
17 | C | Les Grésillons |
18 | C | Gennevilliers |
19 | C | Epinay-sur-Seine |
20 | C | Saint-Gratien |
21 | C | Ermont Eaubonne |
22 | C | Cernay |
23 | C | Franconville Le Plessis-Bouchard |
24 | C | Montigny Beauchamp |
Get off at Montigny Beauchamp |
The departure point, Porte de la Chapelle, is located at a distance of 17,008 km from the destination (Montigny Beauchamp). On foot, he travel time between the departure and the destination is 3 h 47 mn.
All metro or RER routes to Montigny Beauchamp.
By bike, the trajet Porte de la Chapelle Montigny Beauchamp route takes 1 h 19 mn.
Self-service bicycles closest to Porte de la Chapelle
Self-service bicycles closest to Montigny Beauchamp
The inauguration of the Porte de la Chapelle subway station took place on 23 août 1916.
The annual attendance of this station is 3 049 825 passengers.
Detailed plan of route Porte de la Chapelle Montigny Beauchamp by subway:
Highly requested routes:
Montigny Beauchamp Gare de Lyon | Montigny Beauchamp Gare du nord | Montigny Beauchamp Gare Montparnasse | Montigny Beauchamp Gare Saint-Lazare
| Montigny Beauchamp Châtelet-les-Halles
| Montigny Beauchamp République
| Montigny Beauchamp Nation
Streets near the departure location Porte de la Chapelle:
Boulevard Ney, Passage du Gué, Rue de la Chapelle, Rue du Pré, Avenue de la Porte de la Chapelle, Rue de la Concertation, Rue du Fret, Rue Léon Bronchart, Rue Pierre Mauroy, Impasse Raymond Queneau, Place Pierre Mac Orlan, Rue des Cheminots