Plan a journey
From Pierre et Marie Curie to Croix de Chavaux by subway:
The fastest route in the Paris subway from Pierre et Marie Curie to Croix de Chavaux takes 43 minutes. This route takes lines , and . It includes two connections at Place d'Italie and Nation. The complete route crosses 23 stations.
RATP Métro 6
6
Métro 6 : Travaux - Trafic interrompu
Jusqu'au 01/05, du lundi au mercredi à partir de 22h (derniers départs de CDG Étoile et Nation vers 21h40) , trafic interrompu sur l'ensemble de la ligne en raison de travaux.
Bus de remplacement mis en place. Plus d'informations sur le page dédiée.
Result of the trip Pierre et Marie Curie Croix de Chavaux by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Pierre et Marie Curie and take subway line t La Courneuve - 8 mai 1945 | ||
1 | 7 | Pierre et Marie Curie |
2 | 7 | Porte d'Ivry |
3 | 7 | Porte de Choisy |
4 | 7 | Porte d'Italie |
5 | 7 | Maison Blanche |
6 | 7 | Tolbiac |
7 | 7 | Place d'Italie |
Correspondance Change at Place d'Italie station and take subway line towards Nation | ||
8 | 6 | Place d'Italie |
9 | 6 | Nationale |
10 | 6 | Chevaleret |
11 | 6 | Quai de la Gare |
12 | 6 | Bercy |
13 | 6 | Dugommier |
14 | 6 | Daumesnil |
15 | 6 | Bel-Air |
16 | 6 | Picpus |
17 | 6 | Nation |
Correspondance Change at Nation station and take subway line towards Mairie de Montreuil | ||
18 | 9 | Nation |
19 | 9 | Buzenval |
20 | 9 | Maraîchers |
21 | 9 | Porte de Montreuil |
22 | 9 | Robespierre |
23 | 9 | Croix de Chavaux |
Get off at Croix de Chavaux | ||
Position of the exits on the platform of the arrival station Croix de Chavaux (the wagons in green are near the exits) |
The departure point, Pierre et Marie Curie, is located at a distance of 6,344 km from the destination (Croix de Chavaux). On foot, he travel time between the departure and the destination is 1 h 25 mn.
All metro or RER routes to Croix de Chavaux.
By bike, the trajet Pierre et Marie Curie Croix de Chavaux route takes 29 mn.
Self-service bicycles closest to Pierre et Marie Curie
Self-service bicycles closest to Croix de Chavaux
The inauguration of the Pierre et Marie Curie subway station took place on 1er mai 1946.
The annual attendance of this station is 1 457 937 passengers.
The station Croix de Chavaux, located at Montreuil, was inaugurated on 14 octobre 1937.
It benefits from an annual attendance of 5 116 243 travellers.
Detailed plan of route Pierre et Marie Curie Croix de Chavaux by subway:
Highly requested routes:
Croix de Chavaux Gare de Lyon | Croix de Chavaux Gare du nord | Croix de Chavaux Gare Montparnasse | Croix de Chavaux Gare Saint-Lazare
| Croix de Chavaux Châtelet-les-Halles
| Croix de Chavaux République
| Croix de Chavaux Nation